top of page

2- SCHEMATIC DESIGN

In this phase, we begin the process of translating the Program into an efficient building design. This is when we start exploring design concepts;

SD Deliverables: Preliminary Site and Floor Plans, Preliminary Exterior Concept (if applicable)
SD Duration: usually 4-8 weeks

2- SCHEMATIC DESIGN

SCHEMATIC DESIGN
In this phase, we begin the process of translating the Program into an efficient building design. This is when we start exploring design concepts; it is the time for testing options and getting a general idea of the look and feel. The floor plans and shape of the project will begin to take form, but the specifics about materials and details will come later. The Schematic Design phase includes several meetings where we present ideas to our clients using images of other projects, hand sketches, and models to help visualize the size, shape, and relationship of spaces to each other. We listen and observe your reactions, then refine the ideas according to your feedback until we reach an agreed upon design direction to develop further in the following phases. Clients can expect to be quite engaged throughout this phase and to be asked for approval of the Schematic Design before work proceeds. Make sure to let your design professional know if you don’t understand something and take the time necessary to give thoughtful feedback. It is always possible to make changes later, but it is easiest during this phase when the design is most fluid.

SD Deliverables: Preliminary Site and Floor Plans, Preliminary Exterior Concept (if applicable)
SD Duration: usually 4-8 weeks

ION CONSTRUCTION

ARCHITECTURE DESIGN LTD. CO. 

| Steel Structure Buildings | 

| Wooden Houses | 

| Tiny Homes | 

info@ion-construction.com 

Subscribe Form

Thanks for submitting!

©2023 by ION ARCHITECTURE

Escrow payment method
00:00 / 04:08
  • Twitter
  • Instagram
  • Facebook
  • LinkedIn
  • Google Places
payment methods
bottom of page